Tag: slab edge

Post foot

Post foot

Post foot

The Post foot (product code 912105) connects to the top of concrete slabs keeping the edge clear for fixing facade brackets, when unitised curtain-walling is to be installed or when masonry forms the external facade.

The Post foot is fixed to the concrete slab using reusable screw anchors, which carries an economical benefit if the edge protection system is to be reused around the project. It is designed to hold a standard system post (product code 912110) which are held captive in the socket base using a twist-lock design, which prevents accidental uplift or removal. The Post foot can also be used with Cast protection (product code. 911140).

• Weight 1,1 kg.
• 100 pieces delivered in stacking box stillage.

Art no. 912105

Product sheet

Post foot edge protection

Post foot edge protection bracket for concrete_slab egde constructions

Post foot edge protection bracket for concrete_slab egde constructions

Post foot edge protection bracket for concrete_slab egde constructions UK

Post foot edge protection bracket for concrete_slab egde constructions UK

Vertical bracket

Fixing temporary edge protection to the edge of the concrete slab offers a clear working area on top of the slab for the installation of systemised framed systems (SFS) or pre-built facade sections.

The Vertical bracket (product code 912118) is attached to the edge of the concrete using two reusable screw anchors. It offers two clearance distances from the side of the slab to accommodate framed facade system overhangs.

• Fits common balcony attachments.
• M10 c/c 100 mm.
• Two installation methods.
• Installed with cc up to 2,4 m.
• Hot dip galvanized.
• Weight 1,4 kg.

Art. No. 912118

Product sheet

Temporary edge protection on house construction UK

Temporary edge protection on balcony concrete constructions UK

Temporary edge protection on concrete slab edge constructions UK

vertical_bracket_safetyrespect_2

vertical_bracket_safetyrespect_3