Temporary edge protection at First Street Manchester UK

SafetyRespect’s temporary edge protection delivered to construction project at First Street in Manchester

SafetyRespect’s temporary edge protection barrier system’s lightweight and adjustable design has made it first choice at Manchester’s prestigious First Street development, Plot 9a in Manchester.

In the video above our MD Oliver Gwinnell is talking about the site. Over 2,100 linear metres of temporary edge protection barriers is being used to protect site staff while the nine floor, 131,000 square feet office building is built. The systems lightweight adjustable design makes it ideal for installing on the beam and lifting into the position. It can be adjusted up and down and in and out to facilitate the stud welding and metal deck installation without the need to remove the barriers. The products are robust enough for heavyweight, long-term use making it more and more everyone’s first choice.

Plot 9a, First Street is an office building in central Manchester with an expected completion date of August 2024. The main contractor is BAM Construction.

Temporary edge protection at First Street Manchester UK
Temporary edge protection at First Street Manchester UK

Temporary edge protection delivered to project at First Street, Plot 9a in Manchester

SafetyRespect’s temporary edge protection barrier system’s lightweight and adjustable design has made it first choice at Manchester’s prestigious First Street development, Plot 9a in Manchester.

In the video above our MD Oliver Gwinnell is talking about the site. Over 2,100 linear metres of temporary edge protection barriers is being used to protect site staff while the nine floor, 131,000 square feet office building is built. The systems lightweight adjustable design makes it ideal for installing on the beam and lifting into the position. It can be adjusted up and down and in and out to facilitate the stud welding and metal deck installation without the need to remove the barriers. The products are robust enough for heavyweight, long-term use making it more and more everyone’s first choice.

Plot 9a, First Street is an office building in central Manchester with an expected completion date of August 2024. The main contractor is BAM Construction.

Temporary edge protection at First Street Manchester UK
Temporary edge protection at construction project Gramercy Tower Cardiff UK

Connected Thinking and Systems In Cardiff

Multiple SafetyRespect UK systems and training courses have been employed at Gramercy Tower which, when completed, will be Cardiff’s tallest building.  The joined-up approach with principal contractor Intelle Construction and sub-contractors Concrete Structures and Floors Ltd and TGM Facades has seen a trio of fall protection solutions employed including edge protection barriers, catch fans and the innovative Scissorsafe anchorage system. Plus, SafetyRespect UK are providing ‘working in restraint’ and ‘rescue’ training courses for the benefit of the site workforce.

Producing A Permanent Safety Envelope

Concrete Structures and Floors Ltd and TGM Facades worked with SafetyRespect UK to create a ‘safety envelope’ around the building to protect workers and to protect members of the public who work, walk, and drive past this prestigious inner-city development.

Gramercy Tower is surrounded by offices, car parks and roads. SafetyRespect UK Catch Fans were used on the elevations where there was the risk of potential failing objects onto site and public areas below. As well as the strategically positioned catch fans, temporary edge protection barriers have been placed around all perimeters.

And the innovative Scissorsafe anchorage system is being used to facilitate a ‘work restraint system’ for the installation of the façade. An additional benefit of this solution is that requires cast-in void formers rather than drill and fix connections as such reducing build time and the risk of site worker hand-arm vibration (HAV).

Catch fans fall protection at Gramercy Tower Cardiff UK

Connected Thinking, Connected Systems

Facade panels will create a striking fully glazed appearance, but this design required the removal of the temporary edge protection barriers during installation. The facade installers used a temporary work restraint system (a running-Line) at ceiling height attached to Scissorsafe – the cast-in anchorage system.

By using cast-in void formers, the Scissorsafe system doesn’t require on site drillingthus saving time and money plus there’s no load testing required. Maximum length lanyards allowed installers to work at the edge of the slab but no more, preventing them from falling.

TGM Facades, who designed and installed the facades at Gramercy Tower specified the use of Scissorsafe.

Scissorsafe personal fall protection at Gramercy Tower Cardiff UK

Dominic McKeown, Site Manager said, “SafetyRespect were chosen for this project because of the safety anchors. Inserting the anchors as the slab is being poured takes out the element of drilling bolts afterwards with no dust and no HAVS involved. This protects the workforce from unnecessary risks.”

Also, there are no columns available for slings to be used, no holes through the floor plate unlike the use of omni anchors which increases the risk of water ingress to the lower level. All of this keeps the main contractor happy.

“SafetyRespect worked closely with us on design and layout highlighting potential issues prior to installation.”

Concrete Structures and Floors Ltd are using the VT system temporary edge protection and catch fans manufactured and supplied by SafetyRespect UK. The temporary edge protection system has been positioned on top of the floor slabs, around all perimeters. SafetyRespect UK were able to supply multiple products quickly, this was very important to Concrete Structures and Floors Ltd Managing Director Sean O’Sullivan.

He said, “I choose SafetyRespect because I know I will get what I need for my project with no hassle. All it takes is one phone call by me and I know they will respond on time and on brief. And often I will get additional thoughts from the SafetyRespect team as they understand the industry so well. I feel safe with SafetyRespect.”

Temporary edge protection at Gramercy Tower Cardiff UK

On-going Specialist Training To Ensure Correct And Safe Usage

SafetyRespect are also providing periodic training courses for installers work restraint and rescue. This on-going service ensures that ever changing site staff have the best knowledge to ensure their safety and that of their colleagues.

Rescue training at Gramercy Tower Cardiff UK

Joined Up Thinking

David McGrath, Assistant Site Manager, Intelle Construction said, “We are very happy with the systems specified by Concrete Structures and Floor Ltd and TGM Facades. They came up with product solutions and invested in on-going training. The joined-up thinking benefitted the site workforce and the general public on this inner-city development.”

SafetyRespect UK Sales Manager Terry Gardner said, “Gramercy is a blueprint for connected thinking and strong planning. Main contractor Intelle worked with TGM and Concrete Structures And Floors Ltd in association with ourselves with three main objectives. Firstly, the creation of a safety envelope for workers. Secondly, a protection system for members of the public surrounding the site. Finally, the ability to use systems that balanced safety with speed of operation.

“But what I like about the connected thinking is the long-term training solution ensuring workers have the best knowledge to ensure their safety and that of their colleagues.”

Catch fans fall protection at Gramercy Tower Cardiff UK

Scissorsafe personal fall protection at Gramercy Tower Cardiff UK


Published October 26, 2023.

Temporary edge protection on steel beams at construction site

Adjustable brackets on side of steel sections

Temporary edge protection on steel beams at construction site

A planned temporary edge protection system fixed to the steel section web, offers a clear working space and unobstructed top and bottom sections for structural framed facade system (SFS) installation from inside the structure. The edge protection is connected into Flex facade brackets and are pre-adjusted to allow clearance for overhangs. Flex facade brackets are bolted into pre-drilled holes in the section webs. Design support is provided with hole positions or Tekla detailing.

PRODUCTS
• Threaded rods
• Flex facade bracket
• Post 1,3 m
• Post 1,5 m alu
• Barrier 1,3, 2,6

Temporary edge protection on steel beams at construction site

Temporary edge protection on steel beams at construction site

Temporary edge protection on steel beams at construction site

Edge protection on steel structure

Facade bracket for attaching edge protection steel

 

Temporary edge protection on concrete floor slabs at construction site in UK

Precast concrete floor slabs

Temporary edge protection on concrete floor slabs at construction site in UK

Pre-casting concrete elements allows for inclusion of cast-in components to support the temporary edge protection system needed to erect the structure. If edge protection is needed on top of the slab, anchor sockets can be cast to support a Post foot (product code 912105). For side of slab positioning cast-in anchors will support Vertical brackets (product code 912118).

Omnia slabs can be delivered with Precast socket (product code 911108) projecting from the top of the bottom concrete layer.

Socket with Rebar 400 mm is an expendable socket that is embedded into slabs or beams with a minimum depth of 500 mm.

If anchoring is to be avoided, Adjustable clamps 300 or 550 can be installed on site before the units are lifted into position.

In the brackets our Post 1,3 m is installed and thereafter Barrier 2,6. The Barrier can be raised in one simple operation on the post up to a height of 310 mm above the floor structure, without decreased safety. This creates conditions for joint grouting, casting and other common work tasks without any need of uninstalling the edge protection.

SafetyRespect offer technical support and will provide a schedule of the equipment required to protect your door openings.

PRODUCTS
• Post foot
• Socket base
• Precast socket
• Socket with rebar 400 mm
• Clamp 300
• Clamp 550
• Post 1,3 m
• Barrier 1,3, 2,6
• Cast protection for Post foot
• Cast protection for Socket base

Temporary edge protection on concrete floor slabs at construction site in UK

Post foot edge protection bracket for concrete_slab egde constructions UK

standard_system_safetyrespect_0136c

Adjustable Clamp 300 as attachment for collective edge protection on concrete slab floor

standard_system_safetyrespect_0114c

Temporary edge protection with precast socket on construction site in UK